Check out the Transport and Main Roads website for the latest roadworks updates on the Bruce Highway. Head to the bottom of the page and click the October update for an information sheet and map.
TMR recommends drivers allow additional travel time as follows:
- Childers to Kolan River – allow an extra 25 minutes
- Maryborough to Childers – allow an extra 20 minutes
- Gympie to Maryborough – allow an extra 10 minutes (day and night)
To minimise delays to motorists, there will be a Christmas shutdown from Saturday December 14, to Sunday January 5, 2014. During this period, all roadwork sites will be open to traffic and speed limits reinstated where possible.
Please slow down and obey signage for the safety of roadworkers and motorists.